Waterproofing To Water Tank, Waterproofing To Overhead Water Tank (The treatment consists following :)

If required Breaking existing old cracked plaster up to R.C.C. work cleaning the surface with water, watering and removing loose plaster, removing decayed, cracked R.C.C. portion upto R.C.C. bars.

Removing rust from the reinforcement bar from the sides cleaning applying Rustcides and coating. Providing the layer waterproofing agent on the entire surface mixing with cement + polymer.Providing and applying mix of polymer + cement + Dry sand. Filling the same putty in cracked R.C.C. Portion to fill the potholes. After filling the cracks with putty in patch or cracks providing and applying mix of polymer +cement + polymer grains in past brushing first coat in vertical and applying second coat in horizontal. Applying single coat plaster in 1:4 mix and finishing in I.P.S. finishing, treatment will be done for flooring and Adjoining will upto top hight. Per water tank area approximate 1000 Sqft.

Waterproofing To Internal Water Tank:The treatment consists following :

after dismantling the existing flooring and walls of the water tank to expose R.C.C. slab and removing dismantled materials as directed and carting away the same.

Removing loose plaster, removing decayed, Cracked Portion of plaster upto R.C.C. or brick work area.

Removing the dust from R.C.C. wall Applying water and cleaning with water, applying One coat of polymer + cement applying as a Bound coat.

Providing and applying mix of Polymer + Cement + Dry sand 1 : 2 : 3 . Filling the same putty in cracked R.C.C. porion brick column joints.

After filling the cracks with putty in patch or cracks Providing and applying mix of Polymer + Cement + Polymer grains in past brushing first coat in vertical And applying second coat in horizontal.

Polymer Base Waterproofing For Slope Terrace:The treatment consists following :

Removing the loose plaster or R.C.C. on new R.C.C. slab. Cleaning the entire terrace neatly with water and after with little Polymer + Cement. Applying the polymer thick slurry in the form of grout spreading on entire terrace.Applying cement mortar in 1:5 mix finishing the entire terrace with line and providing the final surface level with the help of existing provided slope.

Brushing the polymer grains in the form of grout , 1st coat in vertical fashion and 2nd coat in horizontal fashion. Treatment consists of 5 years guarantee. Average thickness of the treatment is 2 to 3 inches.

Waterproofing For Liftwall, Liftroom Top, Watertank Top, Inside The Watertank, Staircase Roof (Slopping Roof), And Elevation Archies.