After RCC repair cleaning the surface treating The edges with One coat of Polymer + Cement. Providing and applying sand faced cement plaster Using approved Screened river sand first coat in 1:4 and second coat in 1: 5 cement mortar with even textured finish including all curing etc., Complete.
Structural strengthening by required “I” section beams By proper gage with the decision of the committee and The proper inspection for required “I” section where it Is required after breaking the existing column, welding The R C.C. structure with existing old reinforcement Jacketing the “I” beams with the proper support etc., Filling the “I” section by M200 mix.
NOTE: Required R.C.C. “I” section material to be supplied free of coat.
Erecting the scaffolding for the required height without damaging the external walls opening the surface cracks by cutting machine. Treating the cracks with water cleaning and waiting the surface applying and filling the cracks with polymer putty and applying one coat of polymer + polymer grains + same colour pigment coating to the entire required surface removing the scaffolding and curing for two days.
Inspecting the toilets bathroom etc. complete and Giving proper idea for required treatment for w.c. And bathroom area. Per building RS. 1000/- (Only Inspection Charges)
After Inspection if required door frame bottom has To be change because of the leakage. (One door cost RS. 500/-) cutting the doorframe bottom around 4 Inch. Ht. And grouting the same pocket with grouting with Cement polymer + sand finishing the door frame a Required as existing.